"It has become a standard procedure to Bornemann / CGT21 the fact of knowing the requirements, developing a particular system solution and implementing it in close cooperation with the client. This has been demonstrated by the number of successfully operating system solutions.

What stands out Bornemann / CGT21 is the ability to offer a single supplier to the client. The integration of the system is optimized and the interfaces within the process are thereby reduced to a minimum.

 
Bornemann  / CTG21 develop a complete system solution for:

Piping
ESD valves, pressure discharge valves and filters
instrumentation
Process control and protection for all components
Usually the entire equipment for the control is installed a separate container where variable frequency drive, energy supply and control system are integrated. Air conditioning allows the installation under the most severe climatic conditions."
 
 
  Projects are divided in two categories: Participated and In Progress.  
     
 
  CTG21 has participated in several major projects in Venezuelan oil industry. They have changed the concept of hydrocarbon production management from conventional flow stations to multiphase pumping.
 
  Several under evaluation.